Task Assignment for Software Development Project by Assignment Method

Natthaphong Luangnaruedom, Nattapat Nuanmaneethiti, Somchai Prakancharoen

Abstract


Software development department has responsibility in manage the optimization of software project development cost. Normally, the software department has a group of programmers whom has a difference competency and hire cost per hour. This experimental research choose Assignment method for solving about task allocation of particular programmer on the same starting time of software development projects. This method can provide the optimal development cost in defined development time of both programmer available time and software project required time.

Full Text:

PDF

References


Brainkart, Initial Basic Feasible Solution - Northwest Corner Method - Transportation Problem, Operations Management, 23/06/2018 available on http://arts.brainkart.com/article/initial-basic-feasible-solution---northwest-corner-method---transportation-problem-1128/

Sloan-school-of-management , The Minimum Cost Flow Problem, April 23, 2013 available on https://ocw.mit.edu/courses/sloan-school-of-management/15-053-optimization-methods-in-management-science-spring-2013/lecture-notes/MIT15_053S13_lec16.pdf

Lakhveer Kaur, Implication of Advanced Vogel Approximation Method, International Journal of Science and Research (IJSR), ISSN (Online): 2319-7064.

Sumitgumber28 and ruhelaa48,Job Assignment Problem using Branch And Bound, GeeksforGeeks,01 Jun, 2021, available on https://www.geeksforgeeks.org/job-assignment-problem-using-branch-and-bound/

Jay Heizer, Barry Rend Operations Management: Sustainability and Supply Chain Management, Twelfth Edition, O’Reilly online learning, 2022.


Refbacks

  • There are currently no refbacks.